In January of 2022, MJW was asked to provide a bid to the Jacksonville Electric Authority (JEA) to upgrade the control panel, selector valves, zone control valves, pneumatic solenoids, and to add a new zone to four separate 6-ton bulk CO₂ fire suppression systems at JEA’s Brandy Branch Generating Station and Kennedy Generating Station. A successful bid was made and MJW was awarded the contract.